Compliance West HT-5000 Test Set
Fabricante:

Imagen 1 de 1
Si tienes otras fotos o manuales para el
Compliance West HT-5000 puedes subir los archivos aquí .
Modelo:
HT-5000
Fecha:
2000
Categoría:
Grupo:
Descripción:
Información
An Introduction to Dielectric Withstand Testing with the HT-5000
The dielectric withstand test is a test which is recognized
by safety agencies worldwide as a valid criterion of safe
assembly of end-use equipment. The HT-5000 is designed as a
research instrument to determine the dielectric properties
of component assemblies of end-use equipment. It applies a
high-voltage potential between Output and Return test leads
and monitors Leakage Current and watches for Dielectric
Breakdown during the test. To aid in testing, the HT-5000
can be configured with or without voltage ramp time, with or
without a test duration timer, and can be set to deliver
high voltage after an arc has been detected to allow safety
engineers to pinpoint the problem.
The dielectric withstand test involves high voltage and
caution should be exercised when using the HT-5000, The
Return Jack on the front panel is connected to ground
potential, and setups should be designed with this in mind,
to guard against the operator contacting high voltage.
Always make sure the return lead is firmly connected.
Leakage Test
The HT-5000 leakage test uses a separate low-frequency
circuit to detect excessive current as a result of low
impedance between the Output and Return jacks on the front
panel. There is not a specific leakage current level
pass/fail requirement at this time for most equipment.
However, higher than normal leakage current on a particular
sample may indicate an assembly or component problem in the
circuit.
The leakage current is also monitored by the HT-5000 to
ensure that excessive leakage does not keep the Tester from
developing full voltage required for the high voltage test.
The HT-5000 will provide full voltage at any leakage current
level up to 10 mA AC and 5 mA DC. The leakage current trip
level is adjustable on the rear panel.
If the green Full Voltage LED lights and the test continues,
the leakage current was below the amount set by the rear
panel adjustment.
If the red Excess Leakage LED lights, the buzzer sounds, and
the test is terminated, the leakage current was over the
amount set by the rear panel adjustment.
High Voltage Dielectric Withstand Test
This test checks for insulation system breakdowns by
applying a high voltage between the Output and Return jacks
on the front panel. The HT-5000 uses a separate
high-frequency circuit to detect arc breakdowns of greater
than 100 nsec duration.
The duration of the test is controlled by the test time
control on the back panel. The test time is counted from the
time the Full Voltage LED is lit to the completion of the
test. The timer may be defeated, allowing the test to
continue for as long as the TEST Button is pressed. The
minimum test time when the timer is defeated is one second.
If the green Hipot Pass LED lights, the test cycle has been
successfully completed, meaning there was no dielectric
breakdown,
If the red Hipot Fail LED lights, a breakdown arc has been
detected.
Type manuel:
Servicio y Manual del usuario
Páginas:
24
Tamaño:
831.24 Kbytes (851188 Bytes)
Idioma:
english
Revisión:
2.1
Manuel-ID:
Fecha:
2000 08 10
Formato:
Documento Scaned, todo legible.
Fecha de subida:
2017 08 05
MD5:
2714d5332f344e3c8941bd418b6c6d62
Descargas:
337
Información
Quick
Start ... 1
Initial
Setup ... 1
An Introduction to Dielectric Withstand Testing with the
HT-5000 ... 3
Leakage
Test ... 3
High Voltage Dielectric Withstand
Test ... 3
High Voltage
Discharge ... 4
Introduction and
Specifications ... 5
Introduction ... 5
Specifications ... 5
Operation ... 7
Setting up the
HT-5000 ... 7
AC Line Voltage
Requirements ... 7
Fuse
Replacement ... 7
Front and Rear Panel
Features ... 7
Initial Checkout
Procedure ... 12
Setting up the HT-5000 for Laboratoiy
Testing ... 12
Factory
Settings ... 12
Voltage Type
Selection ... 12
Adjustment of the Leakage Current
Level ... 12
Adjustment of the High Voltage Ramp
Time ... 13
Adjustment of the High Voltage
Level ... 13
Adjustment of the High Voltage Test
Duration ... 14
Setting the Voltage Ramp
Switch ... 14
Setting the Test Timer
Switch ... 14
Setting the Failure Shutdown
Switch ... 14
Operating
Techniques ... 14
Daily Operation
Test ... 15
Testing
Products ... 15
Test
results ... 15
Hipot
Pass ... 15
Red
LED/Buzzer ... 15
Technical
Assistance ... 19
Maintenance and
Calibration ... 21
Service
Information ... 21
General
Maintenance ... 21
Calibration
Access ... 21
Cleaning ... 22
Performance
Test ... 22
Operation/Lamp Function
Test ... 22
Calibration
Procedure ... 22
Meter Calibration
Adjustment ... 23
Agregar comentario
Términos y Condiciones
Estos términos y condiciones contienen reglas sobre la publicación de comentarios. Al enviar un comentario, declara que está de acuerdo con estas reglas:
- Aunque el administrador intentará moderar los comentarios, es imposible que cada comentario haya sido moderado en un momento dado.
- Usted reconoce que todos los comentarios expresan los puntos de vista y opiniones del autor original y no los del administrador.
- Usted acepta no publicar ningún material que sea deliberadamente falso, obsceno, odioso, amenazando, acosando o invadiendo la privacidad de una persona.
- El administrador tiene el derecho de editar, mover o eliminar cualquier comentario por cualquier motivo y sin previo aviso.
El incumplimiento de estas reglas puede resultar en la prohibición de comentarios adicionales.
Estos términos y condiciones están sujetos a cambios en cualquier momento y sin previo aviso.
Comentarios