Fluke 8062A Multimetr cyfrowy
Producent:
Model:
8062A
Data:
1982
Kategoria:
Grupa:
Opis:
True-rms Multimeter

Informacja

Your Fluke Model 8062A is a handheld, microcomputer-based 4-1/2 digit multimeter that is ideally suited for use in the field, laboratory, shop or home. The 8062A has all the features that have become accepted standards for quality handheld multimeters, as well as some new features that have not been offered before in a handheld multimeter. New features include the following: · True rms measurements for ac signals up to 30 kHz. · Resistance measurements up to 300 MW. · Ability to store any input signal as an offset or relative reference value. Other features include: · FUNCTIONS: Standard DMM measurement functions, such as ac and dc volts and ac and dc current, as well as resistance, continuity, and diode test. · RANGES: Leading zero suppression. Automatic polarity. Overrange indication. Protection from overloads and transients up to 1500V peak. Dual-slope integration a/d conversion to ensure noise-free measurements. Autoranging MW resistance range (to 300 MW), as well as four fixed resistance ranges from 200W to 200 kW. · OPERATOR CONVENIENCE: 4-1/2 digit Liquid Crystal Display. Software-control self-test routines for quick verification of internal circuitry and operation. · POWER: 170 hours of continuous operation can be expected from a 9V alkaline battery (NEDA 1604).

pokaż więcej

Serwis i User Manual
Typ ręczny:
Serwis i User Manual
Strony:
124
Rozmiar:
5.90 Mbytes (6183812 Bytes)
Język:
english
Rewizja:
1
Ręczny ID:
PN 609153
Data:
Jakość:
Dokument elektroniczny, bez skanowania, bardzo dobrze czytelne.
Data przesłania:
2014 11 29
MD5:
123949df8aa2ef1ba8f4b27d8afbee09
Pobrane:
1212

Informacja

This manual pertains to instruments with serial number 6830XXX or higher. 1 Introduction and Specifications ... 1-1 1-1. Introduction ... 1-3 1-2. Specifications ... 1-4 2 Operation Instructions ... 2-1 2-1. Introduction ... 2-3 2-2. Unpacking Your Instrument ... 2-3 2-3. Battery Installation or Replacement ... 2-3 2-4. Fuse Replacement ... 2-5 2-5. Physical Features ... 2-6 2-6. Front Panel ... 2-6 2-7. Display ... 2-8 2-8. Signal Input Limits ... 2-9 2-9. Operation ... 2-10 2-10. Power-On Self-Test ... 2-10 2-11. AC/DC Voltage (V) ... 2-11 2-12. True RMS Measurement ... 2-11 2-13. AC-Coupled AC Measurements ... 2-12 2-14. Waveform Comparison and Conversion ... 2-13 2-15. High Impedance DC Voltage ... 2-14 2-16. AC/DC Current (A) ... 2-15 2-17. Resistance (W) ... 2-18 2-18. Autoranging Megohms ... 2-19 2-19. Autoranging Kilohms ... 2-20 2-20. Diode Test (G) ... 2-21 2-21. Relative (REL) ... 2-22 2-22. Continuity ( ) ... 2-25 2-23. Initial Check-Out Procedure ... 2-25 3 Theory of Operation ... 3-1 3-1. Introduction ... 3-3 3-2. Functional Description ... 3-3 3-3. Microcomputer ... 3-3 3-4. Measurement Acquisition Chip (MAC) ... 3-5 3-5. A/D Converter Cycle ... 3-5 3-7. Current Measurement ... 3-9 3-8. Resistance Measurement ... 3-10 3-9. Continuity Measurement ... 3-11 4 Maintenance ... 4-1 4-1. Introduction ... 4-3 4-2. Service Information ... 4-3 4-3. General Information ... 4-5 4-5. Disassembly and Reassembly ... 4-5 4-6. Calibration and Backup Fuse Access ... 4-6 4-7. Main PCB Access ... 4-7 4-8. LCD and Microcomputer PCB Disassembly and Assembly ... 4-8 4-9. Backup Fuse Replacement ... 4-11 4-10. Cleaning ... 4-11 4-11. Performance Tests ... 4-12 4-12. Initial Procedure ... 4-12 4-13. Microcomputer and Display Test ... 4-12 4-14. Voltage Test ... 4-13 4-15. Resistance Test ... 4-14 4-16. Continuity Test ... 4-15 4-17. Current Test ... 4-15 4-18. Diode Test ... 4-17 4-19. Calibration Adjustments ... 4-17 4-20. Troubleshooting ... 4-19 4-21. Self-Tests ... 4-19 4-22. Ratio Self-Test ... 4-19 4-23. Switch Decoding Self-Test ... 4-20 4-24. Troubleshooting Guide ... 4-21 5 List of Replaceable Parts ... 5-1 5-1. Introduction ... 5-3 5-2. How to Obtain Parts ... 5-3 5-3. Manual Status Information ... 5-4 5-4. Newer Instruments ... 5-4 5-5. Service Centers ... 5-4 6 Accessory Information ... 6-1 6-1. Introduction ... 6-3 6-2. Deluxe Carrying Case (C90) ... 6-3 6-3. Temperature Probes (80T-150C and 80T-150F) ... 6-3 6-4. Current Transformer (80I-600) ... 6-6 6-5. High Voltage Probe (80K-6, ... 6-6 6-6. High Voltage Probe (80K-40, ... 6-7 6-7. High Frequency Probe (83RF) ... 6-7 6-8. High Frequency Probe (85RF) ... 6-8 6-9. Current Shunt (80J-10) ... 6-9 6-10. AC/DC Current Probe (Y8100, ... 6-9 6-11. AC Current Transformer (Y8101) ... 6-10 6-12. Safety Designed Test Lead Set (TL70) ... 6-11 6-13. Deluxe Test Lead Set (Y8134) ... 6-11 6-14. Slim Flex Test Lead Set (Y8140) ... 6-12 6-15. Cables and Adapters ... 6-12 7 Schematic Diagrams ... 7-1

pokaż więcej

Serwis i User Manual
Typ ręczny:
Serwis i User Manual
Strony:
96
Rozmiar:
5.75 Mbytes (6031244 Bytes)
Język:
english
Rewizja:
3
Ręczny ID:
632695
Data:
Jakość:
Skanowany dokument, wszystko czytelne.
Data przesłania:
2016 01 27
MD5:
3f399ef121674fe122ee7905cd4d8d06
Pobrane:
608

Informacja

1 INTRODUCTION AND SPECIFICATIONS ... 1-1 l-l. INTRODUCTION ... 1-1 1-2. SPECIFICATIONS ... 1-2 2 OPERATING INSTRUCTIONS ... 2-1 2-1. INTRODUCTION ... 2-1 2-2. UNPACKING YOUR INSTRUMENT ... 2-1 2-3. BATTERY INSTALLATION OR REPLACEMENT .. 2-1 2-4. FUSE REPLACEMENT ... 2-3 2-5. PHYSICAL FEATURES ... 2-3 2-6. Front Panel ... 2-3 2-7. Display ... 2-6 2-8. SIGNAL INPUT LIMITS ... 2-6 2-9. OPERATION ... 2-7 2-10. Power-On Self Test ... 2-7 2-11. AC/DC VOLTAGE (V) ... 2-8 2-16. AC/DC Current (A) ... 2-12 2-17. Resistance (il) ... 2-14 2-20. Diode Test ... 2-16 2-21. Relative (REL) ... 2-17 2-22. Continuity ( -n-»»I ) ... 2-19 2-23. INITIAL CHECK-OUT PROCEDURE ... 2-20 3 THEORY OF OPERATION ... 3-1 3-1. INTRODUCTION ... 3-1 3-2. FUNCTIONAL DESCRIPTION ... 3-1 3-3. Microcomputer ... 3-1 3-4. Measurement Acquisition Chip (MAC) ... 3-3 3-5. A/D Conversion Cycle ... 3-3 3-6. Voltage Measurement ... 3-5 3-7. Current Measurement ... 3-6 3-8. Resistance Measurement ... 3-7 3-10. Continuity Measurement ... 3-7 i (continued on page ii) 4 MAINTENANCE ... 4-1 4-1. INTRODUCTION ... 4-1 4-2. SERVICE INFORMATION ... 4-2 4-3 GENERAL INFORMATION ... 4-2 4-4. Handling Precautions for Using Static Sensitive Devices ... 4-2 4-5. Disassembly and Reassembly ... 4-3 4-9. Backup Fuse Replacement ... 4-8 4-10. Cleaning ... 4-8 4-11. PERFORMANCE TESTS ... 4-9 4-12. Initial Procedure ... 4-9 4-13. Microcomputer and Display Test ... 4-9 4-14. Voltage Test ... 4-9 4-15. Resistance Test ... 4-9 4-16. Continuity Test ... 4-10 4-17. Current Test ... 4-12 4-18. Diode Test ... 4-12 4-19. CALIBRATION ADJUSTMENTS ... 4-12 4-20. TROUBLESHOOTING ... 4-14 4-21. Self-Tests ... 4-15 4-24. Troubleshooting Guide ... 4-16 5 LIST OF REPLACEABLE PARTS ... 5-1 5-1. INTRODUCTION ... 5-1 5-2. HOW TO OBTAIN PARTS ... 5-2 5-3. MANUAL STATUS INFORMATION ... 5-2 5-4. NEWER INSTRUMENTS ... 5-2 5-5. SERVICE CENTERS ... 5-2 6 ACCESSORY INFORMATION ... 6-1 6-1. INTRODUCTION ... 6-1 6-2. DELUXE CARRYING CASE (C90) ... 6-1 6-3. TEMPERATURE PROBES (80T-150C and 80T-I50) ... 6-1 6-4. CURRENT TRANSFORMER (801-600) ... 6-4 6-5. HIGH VOLTAGE Probe (80K-6, ... 6-4 6-4. HIGH VOLTAGE Probe (80K-40, ... 6-4 6-7 HIGH FREQUENCY Probe (83RF) ... 6-5 6-8 HIGH FREQUENCY Probe (85RF) ... 6-5 6-9. BATTERY ELIMINATOR (A81) ... 6-6 6-10. CURRENT SHUNT (80J-10) ... 6-6 6-11. AC/DC CURRENT Probe (Y8100, ... 6-7 6-12. AC CURRENT TRANSFORMER (Y8101) ... 6-8 6-13. SAFETY DESIGNED TEST LEAD SET (Y8132) ... 6-8 6-14. DELUXE TEST LEAD SET (Y8134) ... 6-8 6-15. SLIM FLEX TEST LEAD SET (Y8140) ... 6-8 6-16. CABLES AND ADAPTERS ... 6-9 7 SCHEMATIC DIAGRAMS ... 7-1

pokaż więcej

Serwis i User Manual
Typ ręczny:
Serwis i User Manual
Strony:
100
Rozmiar:
3.60 Mbytes (3776961 Bytes)
Język:
english
Rewizja:
Ręczny ID:
P/N 632695
Data:
1982 03 01
Jakość:
Skanowany dokument, czytając częściowo źle, nie częściowo czytelny.
Data przesłania:
2017 08 10
MD5:
7041d10e91f921d365d9a94d76964009
Pobrane:
697

Informacja

Instruction Manual INTRODUCTION AND SPECIFICATIONS ... 1-1 1-1. INTRODUCTION ... M 1-2. SPECIFICATIONS., ... 1-2 2 OPERATING INSTRUCTIONS ... 2-1 2-1. INTRODUCTION ... 2-1 2-2. UNPACKING YOUR INSTRUMENT ... 2-1 2-3. BATTERY INSTALLATION OR REPLACEMENT .. 2-1 2-4. FUSE REPLACEMENT ... 2-3 2-5. PHYSICAL FEATURES ... 2-3 2-6. Front Panel ... 2-3 2-7. Display ... 2-6 2-8. SIGNAL INPUT LIMITS ... 2-6 2-9. OPERATION ... 2-7 2-10. Power-On Self Test ... 2-7 2-11. AC/DC VOLTAGE (V) ... 2-8 2-16. AC/DC Current (A) ... 2-12 2-17. Resistance (O) ... 2-14 2-20. Diode Test ... 2-16 2-21. Relative (REL) ... 2-17 2-22. Continuity (-*♦■>!! ) ... 2-19 2-23. INITIAL CHECK-OUT PROCEDURE ... 2-20 3 THEORY OF OPERATION ... 3-1 3-1. INTRODUCTION ... 3-1 3-2. FUNCTIONAL DESCRIPTION ... 3-1 3-3. Microcomputer ... 3-1 3-4. Measurement Acquisition Chip (MAC) ... 3-3 3-5. A/D Conversion Cycle ... 3-3 3-6. Voltage Measurement ... 3-5 3-7. Current Measurement ... 3-6 3-8. Resistance Measurement ... 3-7 3-10. Continuity Measurement ... 3-7 MAINTENANCE ... 4-1 4-1. INTRODUCTION ... 4-1 4-2. SERVICE INFORMATION ... 4-1 4-3. GENERAL INFORMATION ... 4-2 4-4. Handling Precautions for Using Static Sensitive Devices 4-2 4-5. Disassembly and Reassembly ... 4-3 4-9. Backup Fuse Replacement ... 4-8 4-10. Cleaning ... 4-8 4-11. PERFORMANCE TESTS ... 4-9 4-12. Initial Procedure ... 4-9 4-13. Microcomputer and Display Test ... 4-9 4-14. Voltage Test ... 4-9 4-15. Resistance Test ... 4-9 4-16. Continuity Test ... 4-10 4-17, Current Test ... 4-12 4-18. Diode Test ... 4-12 4-19. CALIBRATION ADJUSTMENTS ... 4-12 4-20. TROUBLESHOOTING ... 4-14 4-21. Self-Tests ... 4-14 4-24. Troubleshooting Guide ... 4-15 5 LIST OF REPLACEABLE PARTS ... 5-1 5-1. INTRODUCTION ... 5-1 5-2. HOW TO OBTAIN PARTS ... 5-1 5-3. MANUAL CHANGE AND BACKDATING INFORMATION ... 5-2 6 ACCESSORY INFORMATION ... 6-1 6-1. INTRODUCTION ... 6-1 6-2. DELUXE CARRYING CASE (C90) ... 6-I 6-3. TEMPERATURE PROBES (80T-150C and 80T-150F) . 6-1 6-4. CURRENT TRANSFORMER (801-600) ... 6-4 6-5. HIGH VOLTAGE Probe (80K-6, ... 6-4 6-6. HIGH VOLTAGE Probe (80K-40, ... 6-4 6-7. HIGH FREQUENCY Probe (83RF) ... 6-5 6-8. HIGH FREQUENCY Probe (85RF) ... 6-5 6-9. BATTERY ELIMINATOR (A81) ... 6-6 6-10. CURRENT SHUNT (80J-10) ... 6-6 6-11. AC/DC CURRENT Probe (Y8100, ... 6-7 6-12. AC CURRENT TRANSFORMER (Y8101) ... 6-8 6-13. SAFETY DESIGNED TEST LEAD SET (Y8132) ... 6-8 6-14. DELUXE TEST LEAD SET (Y8134) ... 6-8 6-15. SLIM FLEX TEST LEAD SET (Y8140) ... 6-8 6-16. CABLES AND ADAPTERS ... 6-9 7 SCHEMATIC DIAGRAMS ... 7-1

pokaż więcej