Attrezzatura informazioni:
Keithley 7999-6 Interfaccia | ||
---|---|---|
Produttore: |
Keithley |
|
Modello: | 7999-6 | |
Data: | 2001 | |
Categoria: | Strumenti di misura | |
Gruppo: | Interfaccia | |
Descrizione: | GPIB RF Relay Unit | |
Informazioni: | ||
The Model 7999-6 is an IEEE-488 controlled, single or dual, 4 or 6 pole, 19-inch rack
mounted relay unit. Additional features of the Model 7999-6 are as follows:
• N-type bulkhead connectors (insulated)
• +24VDC power connections
• LED indicators for error, power, and relay status
• Operating range to 4GHz (relay dependent)
• Can be upgraded from 4-pole to 6-pole relays |
Questi manuali sono disponibili per l'attrezzatura di cui sopra:
Keithley -- 7999-6 -- Servizio e manuale utente | ||
---|---|---|
Tipo manuale: | Servizio e manuale utente | ![]() |
Pagine: | 87 | |
Dimensioni: | 1.40 Mbytes (1465105 Bytes) | |
Lingua: | Inglese | |
Revisione: | A | |
Manual-ID/Number: | 7999-6-901-01 | |
Data: | aprile 2001 | |
Qualità: | Documento elettronico, senza ricerca, molto ben leggibile. | |
Data di caricamento: | 02 marzo 2014 | |
MD5: | eda9430778a16daf86eaac26278b6410 | |
Download: | 124 dal 02 marzo 2014 | |
Informazioni: | ||
1 General Information
Introduction
................................................................................
1-2
Feature overview
........................................................................
1-2
Warranty information
.................................................................
1-2
Manual addenda
.........................................................................
1-2
Safety symbols and terms
.......................................................... 1-3
Specifications
.............................................................................
1-3
Unpacking and inspection
.......................................................... 1-3
Inspection for damage
......................................................... 1-3
Handling precautions
.......................................................... 1-3
Shipment contents
...............................................................
1-4
Instruction manual
..............................................................
1-4
Repacking for shipment
...................................................... 1-4
Connections
................................................................................
1-4
2 Connections
Introduction
................................................................................
2-2
Handling precautions
.................................................................
2-2
Configuration
.............................................................................
2-2
Layout
.................................................................................
2-2
Simplified schematic
........................................................... 2-4
Connections
................................................................................
2-5
GPIB control connection
..................................................... 2-5
Power connector
..................................................................
2-8
3 Operation
Introduction
................................................................................
3-2
Maximum signal considerations
................................................ 3-2
Bus operation (GPIB)
.................................................................
3-3
Bus connections
..................................................................
3-3
Primary address
...................................................................
3-3
Programming syntax
........................................................... 3-3
Response messages
............................................................. 3-7
Status model
...............................................................................
3-8
Event register sets
............................................................. 3-10
Enable registers
.................................................................
3-11
Queues
...............................................................................
3-11
Status byte and SRQ
......................................................... 3-13
Service request enable register
.......................................... 3-14
Serial polling and SRQ
..................................................... 3-15
Clearing registers and queues
................................................... 3-16
Programming enable registers
.................................................. 3-17
Reading registers
...............................................................
3-17
Common commands
.................................................................
3-18
GPIB commands
.......................................................................
3-26
ROUTe commands
............................................................
3-26
:CLOSe...............................................................................
3-28
:CONFigure........................................................................
3-29
STATus commands
............................................................
3-30
:QUEue...............................................................................
3-30
SYSTem commands
.......................................................... 3-32
Manual operation
......................................................................
3-34
Switching considerations
.......................................................... 3-35
Connector integrity
............................................................
3-35
Voltage Standing Wave Ratio
............................................ 3-35
Path isolation
.....................................................................
3-36
Insertion loss
.....................................................................
3-36
RFI/EMI
............................................................................
3-36
Errors
........................................................................................
3-37
4 Service Information
Introduction
................................................................................
4-2
Handling and cleaning precautions
............................................ 4-2
Handling precautions
........................................................... 4-2
Card and connector cleaning
............................................... 4-2
Performance verification
............................................................. 4-3
Environmental conditions
.................................................... 4-3
Recommended equipment
................................................... 4-3
Channel resistance tests
....................................................... 4-3
Replacing components
................................................................
4-4
Replacement parts
...............................................................
4-4
Replacement precautions
..................................................... 4-5
Soldering considerations
..................................................... 4-5
Relay replacement
...............................................................
4-5
Circuit board removal
.......................................................... 4-8
GPIB address
..............................................................................
4-8
5 Replaceable Parts
Introduction
................................................................................
5-2
Parts list
......................................................................................
5-2
Ordering information
..................................................................
5-2
Factory service
............................................................................
5-2
Component layout
......................................................................
5-2 | ||
![]() | ||
Avviare il Download gratuito | ||
Comments (0)