Equipment information:

Racal 1996 Counter
Model: 1996
Date: 1988
Category: Measurement instruments
Group: Counter
                                    The 1995/1996 system universal counter utilizes a
microprocessor-controlled multiple register data acquisition
IC for counting and timing to 200 MHz (1.3 GHz on the 1996
with Input C).
The counter provides the following measurement functions:
frequency, frequency ratio, period, 1-ns resolution time
interval, automatic pulse parameters (including duty cycle
and slew rate), phase, and totalize. Time interval averaging
is available via software-derived functions.
The frequency range on Inputs A and B is 0 to 200 MHz; 40
MHz to 1.3 GHz on Input C using an additional board. Trigger
levels on Inputs A and B can be set manually via the front
panel keypad or via auto-trigger with 50% trigger points.
The DC offset component of the input signal may be tracked
by auto-triggering in between readings in the manual mode
(peak tracking). , Use of a timing error correction (TEC)
technique permits measurements with 9-digit resolution m one
second and a single-shot time-interval resolution to 1 ns.
The counter is housed in a 3.5n high X 19" wide full-rack X
19" deep standard corporate enclosure. Total weight does not
exceed 22 lbs (10 kg). Unit is adaptable to rack or bench
top use.

These manuals are available for the above equipment:

Racal -- 1996 -- Service and User Manual
File name: Racal-7295-Manual-Page-1-Picture
Manual Type: Service and User Manual
Pages: 294
Size: 10.91 Mbytes (11443543 Bytes)
Language: english
Manual-ID/Number: 980539
Date: December 1988
Quality: Scanned document, all readable.
Upload date:
MD5: 31beb4d013a248f7953a84230bc79695
ed2kID: f736f2d1405e81a13bed6f1f9244fa50
Downloads: 21 since 25 October 2015
This manual is organized into eight sections:
SECTION 1. General Information: published specifications,
safety considerations, product support, general description,
and options.
SECTION 2. Installation <5c Preparation for Use: unpacking
and initia inspection, reshipment, setup, field installation
of options, power; connections storage and ventilation.
SECTION 3. Local Operation: bench operation, including
general operating information, panel descriptions, and
measurement procedures.
SECTION 4. System Operation: GPIB system operation.
SECTION 5. Oieory of Operation: general theory of operation.
SECTION 6. Maintenance: Performance tests and basic
calibration informatio: for the 1995/1996.
SECTION 7. Drawings: assembly and schematic drawings.
SECTION 8. Parts List: replaceable parts and assemblies.
Start Free Download


No comments yet.

Add Comment

* Required information
(never displayed)
Bold Italic Underline Strike Superscript Subscript Quote Line Bullet Link Email Image Video
Smile Sad Huh Laugh Mad Tongue Crying Grin Wink Scared Cool Sleep Blush Unsure Shocked
Enter the fifth word of this sentence.
Enter answer:
Notify me of new comments via email.
Remember my form inputs on this computer.
Powered by Commentics